Elefsis Refinery Upgrade Project (ERUP – Area II)

 
ATERMON S.A., participates in the Joint Venture “ATERMON S.A. – EKME S.A. – TMUCB S.A. – METKA S.A.”, which has been awarded by Hellenic Petroleum S.A. the Elefsis Refinery Upgrade Project (ERUP – Area II). The subject project constitutes a Hydrockracker Unit with all Auxilliary Units.

Area II includes the following Units / Systems:
- Hydrogen Plant
- Amine Recovery
- Sour Water Stripper
- Sulphur Recovery
- Boiler Feed Water / Steam System
- Steam Condensate Recovery
- Demineralized Water
- Cooling Water System
- Plant & Instrument Air
- Fuel Oil / Fuel Gas
- Flare
- Sulphur Handling.

Scope of Work:
- Preparation and follow up of PRIMAVERA Level 5 Time Schedule
- Issue of spooling and welding maps of the piping isometrics
- Lifting studies for equipment and heavy structures
- Issue of Quality Manual and Procedures for Quality Control and Non Destructive Tests (NDTs)
- Prefabrication and Erection of piping and supports
- Erection of steel structures and racks
- Erection of equipment
- Refractory of equipment
- Bolt tensioning of flanges
- Quality control and NDTs
- Alignment of pumps and rotating machines
- Hydrotests and flushing of piping
- Painting
- Insulation of piping and equipment
- Issue of “As Built” drawings
- Issue of “Quality Book”
- Participation in commissioning activities

Project Completion: July 2012
Contractual Price: 78.000.000,00 Euro


Construction Significant Data:

- Steel Structures: 5.150 tons
- Piping (Carbon Steel, Alloy and Stainless Steel): 4.450 tons
- Number of Equipment: 437 pcs
 
NDTs (in numbers):
- Radiography 20.800
- Hardness Test 19.500
- PMI Test 17.700
- Dye Penetrant 22.000
- Ultrasonic 2.000
- Ferite Content 16.800