You are here: Home Page / Recent Projects / Civil Works for the 400/150kV New Extra-high Voltage Station in Megalopolis

Civil Works for the 400/150kV New Extra-high Voltage Station in Megalopolis

 
The project includes all the Civil Works for the construction of the 400/150kV New Extra-high Voltage Station, nearby the 4th Power Plant at Megalopolis. The project is executed in an area of 175.000m2 owned by PPC.

Scope of Works:
- General Earthworks
- Construction of: internal and external roads, drainage channels, culverts and cable channels, precast slabs for channels’ covering, concrete foundations for electrical / mechanical equipment, 4 autotransformers’ foundations, oil tanks’ foundations, 16 Relay buildings, perimetric fencing of the Extra-high Voltage Station, retaining walls and slopes
- Design and Construction of the Control Room Building.

It is estimated that approx. 24.000m3 of reinforced concrete (various compositions) and 1.000.000 m3 of general excavations, were applied at the specific project.

Duration:
Project Start: 01.08.2011
Project Mechanical Completion: 05.09.2012

Contractual Price: 8.341.467,00 Euro