150kV XLPE UNDERGROUND TRANSMISSION LINE (UGTL): CRETE
Construction / Installation of the 150kV Underground Transmission Line (XLPE insulated), as part of the Project: Design, supply and installation of submarine and underground cable systems 150kV XLPE double circuits for the Interconnection of Crete with Hellenic Electricity Transmission System (Peloponnese-Crete) – Section C:
(in J/V ATERMON S.A.– VINCI, ATERMON’s participation 50%, as subcontractor of Hellenic Cables S.A.)
Length
19,0 Km
Customer
IPTO
Area
CHANIA
Contractual Price
9.199.985,0 €
Execution Period
2019-2020
- CATEGORY Transmission Networks