150kV OVERHEAD TRANSMISSION LINE (OHTL) – KAFIREAS WIND PARKS PROJECT

Procurement of Materials and Erection / Installation of the 150kV Overhead Transmission Line (OHTL) between the SS1 Amygdalea and the Terminal Tower at Bouros-Evia, as part of the “Kafireas Wind Parks” Project

Length

25,8 Km

Customer
SILCIO

Area
EVIA

Contractual Price
8.464.800,0 €

Execution Period
2017-2020