150kV OVERHEAD TRANSMISSION LINE (OHTL) – KAFIREAS WIND PARKS PROJECT
Procurement of Materials and Erection / Installation of the 150kV Overhead Transmission Line (OHTL) between the SS1 Amygdalea and the Terminal Tower at Bouros-Evia, as part of the “Kafireas Wind Parks” Project
Length
25,8 Km
Customer
SILCIO
Area
EVIA
Contractual Price
8.464.800,0 €
Execution Period
2017-2020
- CATEGORY Transmission Networks
- TAGS