Construction of Overhead Medium Voltage Networks at the area of Thrace for the Interconnection of the Wind Parks “Aspri Petra” & “Soros” to the S/S “Kerasia
Customer
WPTh
Area
THRACE
Contractual Price
1.417.000 €
Contractual Dates
2002-2003
Project Completed
2003